
road improvements continue today at High Bridge Road. A few high spots need to be graded out to help long trucks and semi-trailer trucks navigate the road. I was stopped for 5 minutes waiting for a load of stone to be spread out over a low area.
This all means one thing. The heavy equipment and high volume traffic is coming shortly. This industry does not take days off. It could be tomorrow that the next phase begins.
No comments:
Post a Comment